Recovery of metallic manhole grates

Descripción del Proyecto:

Cliente:
 ENAGAS TRANSPORTE
Fecha:
 MAY 2013
Categoria:
Projects

ENAGAS had the problem of recovering some filters and access steps in its Zahara de los Atunes plant.

FILTROS 1

SOLUTION

Reinnor went to the client’s installations with the mobile blasting and painting team to clean them using air pressure blasting, patch up the deteriorated areas to protect the mechanism zones and then give them an anticorrosion treatment that consisted of two-coat priming and a high weather-resistant finish.

FILTROS_ESCALERAS_mini   PINTADO-EN-OBRA_mini   FILTROS_ESCALERAS-ACABADO_mini