Recovery of metallic manhole grates

Descripción del Proyecto:

Cliente:
 ENAGAS TRANSPORTE
Fecha:
 MAY 2013
Categoria:
Projects

ENAGAS had the problem of correctly maintaining the pipeline that passes under the bridge over the Tinto River.

ABRAZADERAS-A-RECUPERAR_mini       RODILLOS_mini

SOLUTION

Reinnor went to the client’s installations and eliminated the elements that were in a bad state (supports, backing, fastenings, etc…) and substituted them with new elements, the pipeline was cleaned and it was given a high weather-resistant finish.

ABRAZADERAS-ACABADAS       TUBERIA-ACABADA